A three-year project for Andritz’ and Montes del Plata’s pulp mill consisted of insulation work, high volume scaffolding and logistic solutions.

Wide scale ISS delivery for pulp mill

The large three-year project for Andritz’ and Montes del Plata’s pulp mill consisted insulation work for the fiber line, evaporation plant, recaustisization process, pulp drying line, lime kiln, recovery boiler, and ESP. On the second part of the project the insulation work covered also the plant turbine and pipe bridge in quantity of 100 000 m2, in addition cable tray installation and coverings. All the operations requested a scaffolding work as high volume as 2 300 000 m3 and a wide range of logistics services and transfer transportations.

Case Facts

Customer: Andritz & Montes del Plata
Duration: 2012–2014
Manpower: 940 person (max.)
Working years: 1030
Scaffolding work: 1 900 000 + 400 000 m3
Extra: logistics and transportations

See Other References

Oil Tanker Life Cycle Renovation

Petrojarl Knarr / Norway

Improving the durability and sustainability of the oil tanker, in demanding weather and temperature conditions.

Read more

LNG Terminal

Port of Röyttä / Finland

Industrial piping insulation, scaffolding work and weather protection for the largest liquefied natural gas terminal in the Nordic countries.

Read more

×
(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','https://www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-77868951-1', 'auto'); ga('send', 'pageview');