The greatest challenges in industrial insulation projects often involve
confined and complex installation environments, plans that change during
the work, and ensuring component compatibility in situations where
dimensional data is incomplete or inaccurate.
In the traditional approach, every change or dimensional deviation can cause delays as
new prefabricated parts must be ordered and waited for on site. Kymsol’s mobile
workshop solves this problem by bringing prefabrication directly to the work location
Parts are manufactured on site — no waiting for deliveries. This simple
change eliminates order-to-delivery delays, transportation risks, and schedule dependencies on external suppliers.
Parts can be measured, manufactured, and fitted on location, which speeds up
installation, reduces waiting times, and ensures the end result matches the actual
dimensions and conditions of the site.
What the mobile workshop means in practice
The mobile workshop is not a temporary solution or a compromise. It is a full-scale
sheet metal workshop operation model in which the necessary equipment is brought to
the project rather than ordering parts from a fixed workshop. Kymsol’s mobile workshop
includes everything needed for on-site prefabrication:
This means that parts needed during the project can be manufactured at the pace they
are required. No surplus stock, no waiting loads, no schedule pressure from logistics.
What types of projects suit the mobile workshop
The mobile workshop is particularly valuable in projects where:
Typical use cases are large industrial investment and maintenance projects involving
extensive insulation and cladding work in demanding operating environments.
Mabi Bingo 16-Z: performance in the field
At the heart of the mobile workshop is the Mabi Bingo 16-Z, a machine widely used by
insulation professionals for precise and efficient sheet metal component production.
Designed for use on site, the machine enables parts to be manufactured directly at the
location according to actual dimensions, speeding up installation work and making it
easier to implement changes even in demanding conditions.
Schedule benefits
In the traditional model, sheet metal parts are ordered in advance or sourced
mid-project from an external supplier. In both cases, delays arise: order processing,
manufacturing, transportation, and receipt can take days or even weeks.
In the mobile workshop, this chain is reduced to a single step. The result:
Cost impact
The largest hidden cost in a project is often waiting time. The mobile workshop
eliminates this structurally — not by optimising processes.
When the insulation crew is not waiting for parts, it is working. This direct
impact on the utilisation of working hours is reflected in the project’s total
costs.
Part of Kymsol’s total delivery
The mobile workshop does not operate in isolation, but as part of Kymsol’s broader
project delivery. Kymsol carries out industrial insulation contracts as a complete
package: from planning to installation and sheet metal component manufacturing.
This is particularly relevant in demanding project environments, such as international
plant deliveries or domestic shutdowns, where schedule deviations translate directly
into production losses for the client.
Kymsol’s mobile workshop is available according to project needs.